TextRanch

The best way to perfect your writing.

Discover why 1,062,726 users count on TextRanch to get their English corrected!

1. Input your text below.
2. Get it corrected in a few minutes by our editors.
3. Improve your English!

One of our experts will correct your English.

Our experts

following up these procedures vs tasks 1 and 2

These two phrases are not directly comparable as they convey different meanings. 'Following up these procedures' implies continuing or monitoring a series of actions, while 'tasks 1 and 2' refers to specific assignments or activities. The choice between them depends on the context and what the speaker wants to convey.

Last updated: March 11, 2024 • 467 views

following up these procedures

This phrase is correct and commonly used in English to indicate monitoring or continuing a series of actions or steps.

This phrase is used when referring to the act of monitoring or continuing a set of procedures or steps that have been previously mentioned or established.

Examples:

  • I will be following up these procedures to ensure they are completed on time.
  • Following up these procedures is an important part of quality control.
  • She is responsible for following up these procedures with the team.
  • Using a proton magnetometer and a recording fathometer to detect ferrous and contour anomalies in the muddy river bed, and following up these procedures ...
  • following up these procedures with a more rigorous confirmatory factor analysis ( CFA). There exists a large body of research literature on the problems ...
  • The Editorial Committee of Qurtuba. Estudios andalusíes thanks the cooperation lent in following-up these procedures. [an error occurred while processing this ...

tasks 1 and 2

This phrase is correct and commonly used in English to refer to specific assignments or activities labeled as tasks 1 and 2.

This phrase is used when specifying or referring to particular tasks or activities that are numbered as task 1 and task 2.

Examples:

  • Please complete tasks 1 and 2 before the end of the day.
  • Tasks 1 and 2 are critical for the project's success.
  • I have finished tasks 1 and 2, and now I'm moving on to the next set.
  • This report documents the results of Tasks 1 and 2 in the proposed work plan. The purpose of these tasks was to study current ramp-metering operations in ...
  • Vehicle Miles Traveled (VMT) Fees. Preliminary Report – Tasks 1 and 2. PRC 14- 02-P. Page 2. Page 3. 3. Vehicle Miles Traveled (VMT) Fees. Texas A&M ...
  • Sep 1, 2014 ... Click here to view Dredge Management Plan Tasks 1 and 2. Home · News; Click here to view Dredge Management Plan Tasks 1 and 2.
  • Number of tasks: 2. Marking: Task 2 contributes twice as much as Task 1 to the Writing score. Tasks 1 and 2. General Training Writing – Task 1. What's involved?

Related Comparisons

What Our Customers Are Saying

Our customers love us! We have an average rating of 4.79 stars based on 283,125 votes.
Also check out our 2,100+ reviews on TrustPilot (4.9TextRanch on TrustPilot).

Why choose TextRanch?

Lowest prices
Up to 50% lower than other online editing sites.

Fastest Times
Our team of editors is working for you 24/7.

Qualified Editors
Native English experts for UK or US English.

Top Customer Service
We are here to help. Satisfaction guaranteed!