TextRanch

The best way to perfect your writing.

Discover why 1,062,726 users count on TextRanch to get their English corrected!

1. Input your text below.
2. Get it corrected in a few minutes by our editors.
3. Improve your English!

One of our experts will correct your English.

Our experts

control period vs control frequency

Both phrases are correct, but they are used in different contexts. 'Control period' refers to a specific time frame during which something is controlled or monitored, while 'control frequency' refers to how often something is controlled or monitored.

Last updated: April 01, 2024 • 601 views

control period

This phrase is correct and commonly used in English.

This phrase is used to refer to a specific time frame during which something is controlled or monitored.

Examples:

  • The experiment requires a control period of two weeks before any conclusions can be drawn.
  • description of measures foreseen for passive institutional control period,
  • This is Ofgem's forecast for RAV at the end of the price control period.
  • 78. All 11 cases examined by the Court in Germany in June 2004 (the principal control period, during which at least half the checks should be carried out) contained sub-measures that could not be checked at the time of the visit.
  • The infrastructure manager shall draw up a framework capacity statement indicating for every section of line per control period and, if applicable by type of service, the following information:
  • The submission interpreted the length of the investment horizon as the length of a price control period.
  • The period therefore should, in general, not exceed one year and the joint control period should be only transitory in nature.
  • Should on-the-spot checks reveal a significant degree of non-compliance with a given area of cross-compliance, the number of on-the-spot checks to be carried out in the following control period shall be increased.
  • The infrastructure manager shall agree on a time frame with the applicant on a case-by-case basis and the time frame should be aligned as closely as possible to the control period in order to facilitate the assignment of the related framework capacity.
  • Surveillance scheme for Member States, zones or compartments for the control period which precedes the achievement of disease-free status for Marteilia refringens as referred to in point I..1
  • Only such a relatively short period will make it unlikely that the joint control period will have a distinct impact on the market structure and can therefore be considered as not leading to a change in control on a lasting basis.
  • Note that at the start of the price control period SHETL is estimated to have a RAV of 0,7bn (which is forecast to increase to 3,6 bn by 2020-21): (pages 36 and 37) and (pages 8 and 9).
  • In the case of a time frame of more than two hours, the infrastructure manager shall assign the framework capacity as close as possible to a two-hour control period.
  • Inspection and sampling scheme for the two-year control period which precedes achievement of approved status for VHS and/or IHN in zones and farms in non-approved zones with an officially recognised documented history of freedom from these diseases

Alternatives:

  • monitoring period
  • regulation period
  • supervision period
  • oversight period
  • observation period

control frequency

This phrase is correct and commonly used in English.

This phrase is used to describe how often something is controlled or monitored.

Examples:

  • The system checks the temperature control frequency every 30 seconds.
  • The low control frequency established in Annex to this Regulation should be followed by Member States importing many consignments of the foodstuffs concerned.
  • Current EU legislation already requires that control frequency should be risk-based and, therefore, the Commission does not consider that a change to the rules for perishable food is necessary.
  • For other operators the control requirements for incorporation into the final products and the control frequency are described in Article 23(4).
  • The number of cells analysed should be based on the spontaneous control frequency of SCE.
  • Item III.A3.005 does not control frequency changers specially designed for vehicles and which operate with a control sequence that is mutually communicated between the frequency changer and the vehicle control unit.
  • 225 does not control frequency changers or generators if they have hardware, "software" or "technology" constraints that limit the performance to less than that specified above, provided they meet any of the following:
  • Automatic analysis CAS data, automatically displays the BMW keys to use quantity; key tooth number; remote control frequency; CAS with the DME synchronization ID; keys scrapped the state, etc;
  • control frequency in case of overfrequency and underfrequency within the whole active power output range between minimum regulating level and maximum capacity as well as at houseload level,
  • The signal emitted from a remote control is modulated at frequencies between 32 and 40 Khz, this depends a bit on manufacture and model. Let's assume the remote control frequency is 38 Khz, since it's the most common value.
  • Control frequency and duration of recording

Alternatives:

  • monitoring frequency
  • regulation frequency
  • supervision frequency
  • oversight frequency
  • observation frequency

Related Comparisons

What Our Customers Are Saying

Our customers love us! We have an average rating of 4.79 stars based on 283,125 votes.
Also check out our 2,100+ reviews on TrustPilot (4.9TextRanch on TrustPilot).

Why choose TextRanch?

Lowest prices
Up to 50% lower than other online editing sites.

Fastest Times
Our team of editors is working for you 24/7.

Qualified Editors
Native English experts for UK or US English.

Top Customer Service
We are here to help. Satisfaction guaranteed!